본문으로 건너뛰기
Workshop overview
Chapter 6 of 7
5 min

Check the core maintenance reasoning

Before explaining the final decision, review what set each severity, the sigma rule, technician and location context, and inspection scope in four questions.

Question for this chapter

Can you separate the four pieces of evidence needed for the final explanation?

Why this matters now

You have inspected the source sensors, anomaly detection, health scores, and the five-category ontology in sequence. Before stating the final decision, distinguish the concepts that can look similar. This quiz has no passing score and does not lock the next chapter.

Core decision check

Select an answer to see the correct choice and its evidence immediately.

0/4 questions reviewed

  1. Question 1 CNC-01 scores 4.00 and is MEDIUM; CNC-07 scores 4.22 and is HIGH. What split the grade?
  2. Question 2 Raising sigma from 3.0 to 4.1 leaves what, out of the six anomalies?
  3. Question 3 Once technician, location, and shift are connected, how should the four HIGH machines be assigned?
  4. Question 4 What is this workshop's conclusion when all four machines have a health score of 90?

Connect the evidence in one statement

Inspect all four machines with explicit HIGH quality signals, start with CNC-03 under the published Workshop tie-break rule, and run CNC-05 and CNC-07 in parallel under their own technicians.

Next decision

You have separated the four pieces of evidence. In the final chapter, return to the original shift question and combine the inspection scope and first stop into one explanation.